Case study
Lokation Newcastle Upon Tyne
Land United Kingdom
År 2012
Contractor BAM construction
Tektilvariant Trevira CS 100
Ophængsløsning Type 11 H profile
Samlet luftmængde 18000 m3/h at 135 Pa
Flowmodeller NozzFlow

Three systems were installed to distribute air-conditioned air evenly in the airport hall without creating excessive draughts. ‘D’ section ducts were used because the ducts had to be fixed directly to the underside of beams and suspended on an H-profile framework.